Construction of electricity substation
Construction of electricity substation. Class C PHC Piles diameter of 450 mm and a length of 15 meters. How to run: Using the Jacked-in Piling 360 ton.
Construction of electricity substation. Class C PHC Piles diameter of 450 mm and a length of 15 meters. How to run: Using the Jacked-in Piling 360 ton.